Pasminko Pt Pirie Smelter Acid Filtration Plant (SA)
Design and Construction
The process used generated Hydrogen gas and was therefore classified a hazardous area. All design, construction and commissioning works were based around the compliance to the AS requirements for this area classification. All associated works were completed without incident and the project operated to design requirements. The approximate value of this project was AUD$450k.