Our Services

P1040079.JPG

Engineering and Design

RJE can provide the following Engineering and Design Services:

• Powe...

More

2006_03210052.JPG

Electrical Construction

Our construction personnel have many years experience in the flowing areas:

<...

More

DSCF1395.JPG

HV Protection Panel Design & Construct

RJE’s recent design and construction of the protection sysytem for the ...

More

2006_03210053.JPG

HV Protection Testing and Commissioning

We understand commissioning on site is often difficult, time consuming and expensi...

More

Looking back towards T Hills 03.jpg

Power System Modelling & Power System Analysis

RJE offer the ability to analyse existing site power networks to identify areas of...

More

Projects

30 Nov 2000

Highland Pine Products Oberon Mill (NSW)

Construction

Oberon Mill Sorter

The sorter consisted of a 40 bin 140 boards per minute feed and sorting system, with the stacking system having a similar capacity. This project had a construction and commissioning period of less than 2 weeks.

The construction design was focussed on maximising pre work as well as off site works in order to minimise the shutdown installation time. The plant was constructed and commissioned on time to a budget of AUD$400k.

< back

Back to Top ↑