Our Services

P1040079.JPG

Engineering and Design

RJE can provide the following Engineering and Design Services:

• Powe...

More

2006_03210052.JPG

Electrical Construction

Our construction personnel have many years experience in the flowing areas:

<...

More

DSCF1395.JPG

HV Protection Panel Design & Construct

RJE’s recent design and construction of the protection sysytem for the ...

More

2006_03210053.JPG

HV Protection Testing and Commissioning

We understand commissioning on site is often difficult, time consuming and expensi...

More

Looking back towards T Hills 03.jpg

Power System Modelling & Power System Analysis

RJE offer the ability to analyse existing site power networks to identify areas of...

More

Projects

31 Jul 2001

MIM Paste Fill Plant (QLD)

Design, Optilmisation & Construction

MIM Past Fill

RJE was commissioned to assist in the redesign of the plant process to achieve a reliable and robust process and process control philosophy. The RJE construction team implemented major plant Electrical and Instrumentation additions and modifications for both the surface and underground system to achieve the required process functionality.

The plant control system was re-designed to provide a robust and accurate recipe control algorithm. On completion of commissioning the plant was proven to operate at over 200% initial design capacity and the project costs were kept within the budget of $550k.

< back

Back to Top ↑