WMC Olympic Dam Mine Ventilation Upgrade (SA)
Design and Construction
RJE has begun the roll out of the automated ventilation control system with the installation and commissioning of VVVF Drive technology on the two larger ventilation drives. The benefits of the remote SCADA control are already evident as is the reduced power usage.