Our Services

P1040079.JPG

Engineering and Design

RJE can provide the following Engineering and Design Services:

• Powe...

More

2006_03210052.JPG

Electrical Construction

Our construction personnel have many years experience in the flowing areas:

<...

More

DSCF1395.JPG

HV Protection Panel Design & Construct

RJE’s recent design and construction of the protection sysytem for the ...

More

2006_03210053.JPG

HV Protection Testing and Commissioning

We understand commissioning on site is often difficult, time consuming and expensi...

More

Looking back towards T Hills 03.jpg

Power System Modelling & Power System Analysis

RJE offer the ability to analyse existing site power networks to identify areas of...

More

The Orange North to Huntley Road Powerline

Cadia, Orange NSW

We (Robin Johnson Engineering) have been contracted to carry out the upcoming works on The Orange North to Huntley Road Transmission Line. The Cable will be installed underground and will follow the route as per the attached map. The trench will be approximately 1200mm wide and up to 3000mm deep and on a daily basis we will aim to cover 20 to 30m of trenching. We will be looking to backfill as much of this 20-30m each day as practicable. Trenching will require the removal of approximately 15 street trees on the Eastern side of McLachlan St between Dalton St and March St. For each tree that is removed there will be two mature replacement trees planted in the same area, and an additional 3 mature trees planted in a council managed space, the replacement species will be Chinese Pistachios.

Back to Top ↑


When will works take place?

Todays Update from RJETodays Update Construction of the Orange North to Huntley Road Powerline has commenced, trenching works have involved the closure of the South bound lane of McLachlan St between Dalton St and March St, March St to Byng St, McLachlan St South between Bathurst Hwy and Warradine St and Edward St between Churchill and Little Brunswick St. Road closures will remain throughout the duration of the work w...ithin these areas, completion of work within the effected area is expected to be completed Mid April 2012. Hours of work involving construction activities are 7am to 6pm Monday to Friday and 8am to 1pm Saturday in residential areas and Monday to Sunday 7am to 6pm in Industrial areas. All enquiries during business hours are to be directed to Cassy Gibbs, Community Relations Officer 0408 916 924.

 

 

 

Back to Top ↑

Who can be contacted?

RJE believe the success of this project will be not only be determined by the construction work but also by the interaction with the Community and how they accept it. This will be best achieved by keeping the community well informed. I have been appointed as RJE’s Community Relations Officer for the duration of this project. It will be my responsibility to keep you informed and provide any updates or changes to our progress. Part of my role is to field any questions or concerns from the public arising from this project, therefore I have attached a card with my details on it for your reference, if you have any questions or require further information please do not hesitate to contact me. We understand that this may cause traffic disruption, and we will ensure that every effort will be made to accommodate for each and every local. I will be door knocking residents and business owners directly affected by the works prior to commencement with a detailed works schedule. A Monthly ad will be placed in the Central Western Daily outlining progress of works over the next coming weeks. Weekly updates as well as any FAQ’s about the project will be on our website which can be found at www.rje.net.au

 

 

Cassy Gibbs Ph:  0408 916 924
Community Relations Officer