RJE was commissioned to perform the construction design,
following on to the construction and commissioning of the Electrical
works associated with the Oberon Mill Dry Mill Sorting and stacking
system. The sorter consisted of a 40 bin 140 boards per minute feed
and sorting system, with the stacking system having a similar capacity.
This project had a construction and commissioning period of less than
2 weeks.